EOL and EOSL plan for:
Agile X IS - 10.1" Industry Tablet PC
Type or order number: 17-A1Bx-1xx1/221x1xxx
Timelines
- Last Time Buy: April 01st 2023
- Last Time Delivery: April 30th 2023
- End of Life (EOL): April 30th 2023
- End of Support (EOSL): April 30th 2026
All active configurations of Agile X IS (Zone 1 and Division 1) Tablet-PC series
- with scan engine
- with 4G/LTE
- all operating system options
- all Ex-certifications
Affected Ex certification:
- UL – UL E226123
- ATEX – DEMKO 16 ATEX 1803
- IECEx – IECEx UL 16.0160
- local country versions based on ATEX/IECEx:
- South Africa – UL-BR 20.1319
- South Africa – MTEx 0711/19.0232
- Brazil – UL-BR 20.1319
- Russia – RU C-DE-BH02.B00212/19ilen
Alternative solution:
- Agile S NI - 10.1" Industry Tablet PC (Zone 2/22 and Division 2)
- Agile S - 10.1" Industry Tablet PC (non-ex)
- BARTEC ET60/65EX2 Android Tablet - 10.1" (Zone 2/22 and Division 2)